Electric Vehicle Charging
- As an existing Grid Rewards customer, is my EV charging now limited when grid balancing participation is scheduled, even if I have not signed up to a new Grid Rewards scheme?
- Can I charge a single phase EV with a three phase charger?
- Does the build in EV charger support Vehicle to grid(V2G)?
- Which activation methods does the EV charger support?
- Can I have my existing charger and a Emaldo® system installed together without overloading my supply?
- Is it possible to lock the Emaldo® EV Charger so that no one can access charging?
- Can I charge my car only from surplus production?